Liquid & solids
Identify the liquid, solids type, particle size and expected solids loading.
PRODUCT / LIQUID STRAINING
Particle removal for liquid process lines.
Screen-based removal of solid particles from liquid pipelines. Review particle size, pressure loss and access for cleaning.
Body type, screen construction, materials and operating limits are confirmed against the proposed design.
APPLICATION REVIEW
Discuss straining duties in industrial water and compatible process-liquid lines, including upstream protection of pumps, valves or other equipment where appropriate.
A screen retains particles according to its opening and construction. It does not remove dissolved substances. Selection must balance retention needs, pressure loss and cleaning access.
ENQUIRY INPUTS
Identify the liquid, solids type, particle size and expected solids loading.
Provide minimum, normal and maximum flow plus the allowable clean and operating pressure loss.
Specify the required screen opening or mesh standard and the equipment to be protected.
Provide operating and design conditions, including possible pressure surges.
State pipe size, flange or thread standard, wetted materials and gasket compatibility requirements.
Describe installation orientation, available space, isolation arrangements and cleaning frequency requirements.
Confirm dimensions, connection rating, flow direction and pipe support before installation.
Allow clearance for opening and screen removal, using the approved design and maintenance instructions.
Review pressure-loss monitoring and cleaning intervals for the actual solids loading.
TECHNICAL RESOURCES
Use the worksheet to record known values and mark unknown items for follow-up.
Download Enquiry Worksheet ↓Request drawings & technical details ↗No. Flow, viscosity, solids loading, screen opening and allowable pressure loss also affect selection.
This page covers pipeline strainers. A particular body type, bag-filter configuration or micron-removal guarantee is not implied; confirm the proposed design and duty before purchase.
Yes. Collected particles increase flow resistance. Agree an inspection and cleaning plan for the process. Isolate, depressurize, drain and cool the equipment as appropriate before opening, following the approved instructions.
Request the outline drawing, screen specification, material details, design conditions and the inspection documents required by your project. Confirm availability before ordering.
PIPELINE STRAINER ENQUIRY